PROJECT:
CITY OF MODESTO PARK SECURITY LIGHTING UPGRADES,
Robertson Park, James Marshall Park and Chrysler Park, Modest, CA
ABOUT THE PROJECT
Pathway lighting — yes, we do that too. As part of the City of Modesto's Park Security Upgrades initiative, Modesto Executive Electric completed new pathway lighting installations across three Modesto parks: Robertson Park, James Marshall Park, and Chrysler Park.
The scope at each location included removing decades-old lighting poles and concrete foundations, re-routing conduits, pouring new foundations, pulling new wire, and installing decorative poles with modern LED fixtures.
The new systems are fully programmable with astronomical controls, auto dim and bright operations, and advanced photometrics for improved light cutoff, meaning better illumination where it matters, less light pollution where it doesn't, and a fraction of the energy consumption of the old fixtures.
Better light. Less energy. Increased safety. Check, check, and check!
Please explore this project's pictures below. If you have any questions, please contact us here.







NEXT PROJECT
PROJECT:
EGUSD MULTIPLE CAMPUS STADIUM LIGHTING UPGRADE
ABOUT THE PROJECT
The EGUSD Multiple Campus Stadium Lighting Upgrade brought a full LED lighting retrofit to four Elk Grove Unified School District high schools, modernizing football field lighting across the district in one coordinated effort.
Modesto Executive Electric managed the complete scope of work — removing existing lights, crossarms, ballast cabinets, control panels, and pole and site wiring to make way for a Musco-designed LED system, including Musco Light Show controls.
The work required careful scheduling around both school sporting events and local soccer club schedules to avoid interrupting a single game or practice. Just as important was protecting existing tracks, fields, bleachers, and surrounding infrastructure while operating heavy equipment to swap out pole top equipment at each campus.
Our team worked safely, efficiently, and within the district's required timeframe, and the results speak for themselves (the stadium lighting looks good!).
Please explore this project's pictures below. If you have any questions, please contact us here.








NEXT PROJECT

PROJECT:
TRINITY PRESBYTERIAN CHURCH
ABOUT THE PROJECT
On this project, our team worked with the staff at Trinity Church to upgrade the exterior parking lot lighting and interior lighting in the sanctuary to the latest in LED technology.
We didn’t want to disturb the buildings beautiful finishes so we partnered with a lighting company to provide retro-fit options that utilized all of the existing light fixtures.
We replaced the lighting control system that combined the controls for the house and theatrical lighting together in one easy to use program lighting control console.
Please explore this project's pictures below. If you have any questions, please contact us here.





NEXT PROJECT

PROJECT:
BRENNAN SPORTS PARK
ABOUT THE PROJECT
Location: Oakdale, CA
The Brennan Sports Park project brought a full lighting retrofit to Brennan Park in Oakdale, California, upgrading the facility to better serve athletes and the local community.
Modesto Executive Electric handled the complete sports lighting retrofit, delivering a modernized system designed for performance, efficiency, and years of reliable use.
Please explore this project's pictures below. If you have any questions, please contact us here.







NEXT PROJECT

PROJECT:
MODESTO CENTRAL SDA CHURCH
ABOUT THE PROJECT
This church needed an exterior lighting makeover. The old HID lighting was dim, hard to service, and costly to operate.
We replaced all of the exterior lightings with new LED fixtures and increased the lighting tremendously while cutting the operating costs dramatically.
The staff couldn’t be happier and has experienced fewer security issues due to the better lighting.
Please explore this project's pictures below. If you have any questions, please contact us here.


NEXT PROJECT

PROJECT:
OLD REPUBLIC TITLE
ABOUT THE PROJECT
We teamed up with Haggerty Construction to update an existing suite better suited for the new tenants and their needs including an updated lobby, centralized printer/copy room, new break room, conference room and dedicated circuits for new office furniture system connections. Walls were moved to create better flow throughout the suite, areas were opened up for new office furniture system installation and a much larger break room with multiple refrigerators, microwaves, dishwashers etc. were added for the employees convenience.
During the partial remodel we listened to the new tenants concerns regarding the old 2x4 fluorescent parabolic light fixtures and came up with a plan to increase the lighting substantially while reducing their overall electrical consumption in the entire space. Automatic sensors were installed in the smaller offices and the latest in lighting controls including digital dimming were installed in the larger rooms including the new conference room for multiple options of lighting control for various presentation needs.
Please explore this project's pictures below. If you have any questions, please contact us here.




NEXT PROJECT

PROJECT:
MODESTO JUNIOR COLLEGE
ABOUT THE PROJECT
This project was for the Yosemite Community College District at the Modesto Jr College West Campus parking areas.
We worked with Central Valley Asphalt to reroute traffic patterns and update the area with new LED lighting.
Please explore this project's pictures below. If you have any questions, please contact us here.